Preparatory Survey on the Jericho Wastewater Collection, Treatment System and Reuse Project

Project Features
Construction of sewer pipelines and waste water treatment plant to improve the sanitary condition of Jericho Municipality and reuse treated water; the treatment plant is designed to reduce the pollution load (BOD/SS 500mg/L, T-N 75nmg/L) to acceptable levels using an extended activated sludge system.

Scope of Services
Data collection and site survey; conduct of topographic survey and geotechnical surveys for the WWTP site and the pipeline route, water quality and socio economic surveys; preparation of basic design of WWTP and pipeline including civil/architectural structures, mechanical/electrical facilities and pipe installation; preparation of cost estimates and construction plans; conduct of environmental/social impact studies