Caye Caulker Feasibility Study for a Potable and Wastewater Facility

Project Features
Rehabilitation, upgrading and expansion of the water supply, sanitation and sewerage systems on Caye Caulker to meet the demand in year 2020 to achieve efficient and sustainable provision of the services that will be consistent with the overall objectives of the Coastal Zone Management Program, particularly on the conservation and sustainable use of the Barrier Reef Complex.

Scope of Services
Review and analysis of the existing condition of the water supply and sanitation/sewerage systems on Caye Caulker; inventory of the currently used service units/components including their capacities and conditions, financial, institutional and physical operation and maintenance systems; preparation of feasibility studies and preliminary designs including cost estimates for the rehabilitation, upgrading and expansion of the water supply and sanitation/sewerage systems to be implemented by stages; preparation of the terms of reference for detailed design and preparation of tender documents construction and construction supervision; preparation of a detailed budget and cost estimates; conduct of the Environmental and Social Impact Assessment; and analysis of the impact of the project on low-income groups.

Client
Inter-American Development Bank

Funding Institution
Inter-American Development Bank

NJS Consultants Co., Ltd.

Head Office,Tokyo

  1-1-1, Shibaura, Minato-ku, Tokyo 105-0023 Japan
  +81-3-6324-4344
+81-3-6324-4345